The Centek TUR centralizer passes through a restricted ID, returns to zero start and running forces and back to its original design

CASE STUDY The Centek TUR centralizer passes through a restricted ID, returns to zero start and running forces and back to its original design

THE CHALLENGE

This operator in the Agbami field needed centralizers that were able to pass through the restricted ID of the 16” casing and then expand to 17 1/2” in the next hole section to ensure proper centralization of the 13 5/8” casing string.

THE SOLUTION

13 5/8” Centek TUR centralizers were passed through a restriction of 14.823” in the 16” casing for 9,250ft and then reverted back to zero start and running forces in the 17 1/2” open hole.

THE RESULT

Running the Centek centralizers as the first option helped to save 3 days of rig time, compared to conventional centralizers which may have been unable to get to bottom, first time.

CUSTOMER TESTIMONIAL

“This is a technology improvement/ innovation that will continue to be deployed for this application in
deep water
Agbami wells.”

Christian Rogerson, Drilling Operations Engineer, Chevron