Centek centralizers are being used in the Eden Project’s first geothermal well

NEWS Centek centralizers are being used in the Eden Project’s first geothermal well

We’re excited to announce that Centek single piece centralizers are being used in the Eden Project’s first geothermal well. This world-renowned enterprise in Cornwall, UK has long pioneered environmental initiatives and is on track to be carbon neutral by 2023.

Our heat-treated centralizers are designed to be able to perform even in the high temperature and extreme pressures of a geothermal well, creating a good cement sheath and protecting the local environment from leaks. A combination of the new OBS-2 for the vertical sections and the S2 for the horizontal sections of the wellbore where its runability, strength and flexibility are most needed, has been specified by Halliburton, the contractor.

These products are to be shipped just 65 miles down the road from our Newton Abbot manufacturing base. The first geothermal well has been developed to power over 5,000 nearby homes, with a second well planned. Drilling started in May 2021 with the completion likely in September

Find out more on this new venture - https://www.edengeothermal.com


PRODUCTS USEDS2-HD Heavy Duty Bow Spring Centralizer

This heavy-duty version of the patented S2 bow spring centralizer is engineered for ultra-high strength in challenging wells

PRODUCTS USEDOBS-2 Bow Spring Centralizer

For use in vertical, deviated and horizontal wells